2022 BMW M4 Competition xDrive at Porsche Ontario
https://research.porscheontario.com/cars/Used/2022/BMW/M4/Competition+xDrive/162139422022 BMW M4 Competition xDrive
Selling Price : $72,881
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 11,213
- VIN : WBS33BA02NCK63751
- Stock # : 12140UX
- Engine : Twin Turbo Premium Unleaded I-6 3.0 L/183
- Transmission : 8-Speed Automatic w/OD
- Ext. Color : Frozen Portimao Blue Metallic
- Int. Color : Fjord Blue/Black
- Vehicle Type : Convertible
- Body Style : Convertible
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
M SHADOWLINE LIGHTS, M COMPOUND BRAKES W/RED CALIPERS, ICON ADAPTIVE LED HEADLIGHTS W/LASERLIGHT, CARBON FIBER TRIM, Window Grid Antenna, Valet Function, Trunk Rear Cargo Access, Trip Computer, Transmission w/Driver Selectable Mode and Oil Cooler, Tracker System. This BMW M4 has a dependable Twin Turbo Premium Unleaded I-6 3.0 L/183 engine powering this Automatic transmission.*This BMW M4 Competition xDrive Has Everything You Want *Tire Specific Low Tire Pressure Warning, Tire Mobility Kit, Strut Front Suspension w/Coil Springs, Streaming Audio, Sport Leather/Metal-Look Steering Wheel, Speed Sensitive Rain Detecting Variable Intermittent Wipers, Smart Device Integration, SiriusXM w/360L, Side Impact Beams, Rocker Panel Extensions, Remote Releases -Inc: Comfort Access Proximity Cargo Access, Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry, Illuminated Ignition Switch and Panic Button, Regenerative Alternator, Redundant Digital Speedometer, Rear HVAC w/Separate Controls, Rear Cupholder, Rear Collision Prevention, Radio w/Seek-Scan, Clock, Speed Compensated Volume Control, Steering Wheel Controls, Voice Activation, Radio Data System, External Memory Control and 20 Gb Internal Memory, Proximity Key For Doors And Push Button Start And Smart Device Proximity Key, Power Rear Windows.* Visit Us Today *Live a little- stop by Porsche Ontario located at 2262 Inland Empire Blvd, Ontario, CA 91764 to make this car yours today!
Vehicle Features
- M SHADOWLINE LIGHTS
- ICON ADAPTIVE LED HEADLIGHTS W/LASERLIGHT
- FJORD BLUE/BLACK EXTENDED MERINO LEATHER UPHOLSTERY (ZA)
- EXECUTIVE PACKAGE -inc: Remote Engine Start Head-Up Display Heated Steering Wheel
- WHEELS: 19 X 9.5 FR/20 X 10.5 RR SILVER -inc: Style 826M M double-spoke
- M CARBON BUCKET SEATS
- FROZEN PORTIMAO BLUE METALLIC
- M COMPOUND BRAKES W/RED CALIPERS
- M DRIVER'S PACKAGE
- CARBON FIBER TRIM
- Turbocharged
- All Wheel Drive
- Active Suspension
- Power Steering
- ABS
- 4-Wheel Disc Brakes
- Brake Assist
- Locking/Limited Slip Differential
- Aluminum Wheels
- Tires - Front Performance
- Tires - Rear Performance
- Heated Mirrors
- Power Mirror(s)
- Integrated Turn Signal Mirrors
- Power Folding Mirrors
- Rear Defrost
- Intermittent Wipers
- Variable Speed Intermittent Wipers
- Rain Sensing Wipers
- Rollover Protection Bars
- Convertible Soft Top
- Daytime Running Lights
- Automatic Headlights
- Headlights-Auto-Leveling
- LED Headlights
- Automatic Highbeams
- AM/FM Stereo
- Satellite Radio
- HD Radio
- Requires Subscription
- MP3 Capability
- Steering Wheel Audio Controls
- Auxiliary Audio Input
- Hard Disk Drive Media Storage
- Satellite Radio
- Requires Subscription
- Premium Sound System
- Bucket Seats
- Power Driver Seat
- Power Passenger Seat
- Heated Front Seat(s)
- Power Driver Seat
- Power Passenger Seat
- Pass-Through Rear Seat
- Rear Bench Seat
- Adjustable Steering Wheel
- Trip Computer
- Power Windows
- Leather Steering Wheel
- Keyless Entry
- Power Door Locks
- Keyless Start
- Keyless Entry
- Power Door Locks
- Hands-Free Liftgate
- Universal Garage Door Opener
- Cruise Control
- Climate Control
- Multi-Zone A/C
- A/C
- A/C
- Rear A/C
- Leather Seats
- Auto-Dimming Rearview Mirror
- Driver Vanity Mirror
- Passenger Vanity Mirror
- Driver Illuminated Vanity Mirror
- Passenger Illuminated Visor Mirror
- Floor Mats
- Mirror Memory
- Seat Memory
- Navigation System
- Smart Device Integration
- Telematics
- Requires Subscription
- Bluetooth Connection
- Keyless Start
- Power Door Locks
- Power Windows
- Trip Computer
- Navigation System
- Pass-Through Rear Seat
- Security System
- Immobilizer
- Traction Control
- Stability Control
- Traction Control
- Front Side Air Bag
- Rear Parking Aid
- Blind Spot Monitor
- Cross-Traffic Alert
- Rear Collision Mitigation
- Lane Departure Warning
- Front Collision Mitigation
- Driver Monitoring
- Tire Pressure Monitor
- Driver Air Bag
- Passenger Air Bag
- Passenger Air Bag Sensor
- Knee Air Bag
- Back-Up Camera
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.